Al – Assad for Rebar rolling

Al – Assad for Rebar rolling

  • Installing & commissioning for the rebar rolling
  • Maximize the prober productivity during five years to reach 3 times the design rate of the
  • Adjust the optimization mode for both the cropping shears to achieve the maximum yield for the
  • Upgrading for the SCADA WONDERWARE form 11 to Version8
  • Also upgrading the OWS from 4.5 to Ver. 5

Project Description

Client: Al - Assad for Rebar rolling
Location: SUDAN